Pre-consultation meetings are held twice a month from 9:30 a.m. to noon, with approximately 30 minutes allocated to each proposal, and applications must be submitted at least two weeks before the meeting date.
A pre-consultation meeting is an informal meeting where the applicant introduces the proposal, Town staff from each department provide feedback, the applicant can ask questions throughout the meeting and at the end, and a complete application checklist is provided approximately two weeks after the meeting.
Associated fees can be found on the Fees and Charges page. In some instances, a pre-consultation fee through the Lake Simcoe Region Conservation authority (LSRCA) is also required. Both fees (if applicable) must be paid before the meeting. Please check with the LSRCA.
To book a pre-consultation meeting, please prepare the following:
- Completed Pre-Consultation Meeting Request Form
- Owner Authorization Form, if applying on behalf of the property owner
- Concept Site Plan showing:
- All dimensions and setbacks in metric
- Building and site sizes
- Parking areas
- Landscaped and hard-surface areas
- Existing vegetation and structures
- Concept Elevations, if available
- Any other information that will help staff understand the proposal
Submit all information to Planning.