All Town outdoor recreational amenities such as sports fields, playgrounds, basketball courts, skate parks, bike parks, picnic areas, park shelters, and community gardens are closed as per the Province’s Emergency Closure Order. For a full list of updates and frequently asked questions please visit our dedicated COVID-19 page  http://ow.ly/15Pq50yLtSO


 > Home Page > Services > Road Construction and Capital Engineering Projects

Road Construction and Capital Engineering Projects

The Capital Engineering branch is responsible for various engineering projects throughout the Town, outside of new development/unassumed areas.

The Capital Engineering branch is responsible for the following projects:

2020 Construction

 
Type of Work 

 
Locations 
Road Resurfacing
  • King St.from Princess St. to Robert Hunter Cres.
  • Stegman Rd. (East of Red Mills Dr. to Hilltop Dr.)
  • Hilltop Dr. (East of Red Mills Dr. to East end)
  • Oxford Court (Farr Ave. to South end)

Road Resurfacing with Ditch Regarding and Culvert 
Realignments 

  •  Sharon Blvd. from Farr Ave. to Conn Dr.
Double High Float Surface Treatment 
  • Hillcrest Dr. from cul-de-sac to 150m east
  • Holborn Rd. from 2nd Concession Rd. to Leslie St.
  • 2nd Concession Rd. from Holborn Rd. to North end)
  • Doane Road from Centre St. to West end
  • Hornes Rd. from Woodbine Ave. to Warden Ave.
  • Jeffery Crescent 

Slurry Seal

  • Holborn Rd. from Woodbine Ave. to Hwy 404 cul-de-sac
  • Cedar St. from 120m East of Walnut Ave to East end
Sidewalk Construction 
  • Highway 48 from Princess St. to Foodland

Miscellaneous Concrete Repairs (Sidewalks & Curbs)

  • Various Locations throughout Town

 For more information on current and upcoming regional construction projects in East Gwillimbury, click herelinks to external site.

 

 

Strategic Alignment​


Culture of municipal excellence puzzle piece
Click the puzzle pieces to learn more about this project aligns with the Strategic Plan.