Road Construction and Capital Engineering Projects

The Capital Engineering branch is responsible for various engineering projects throughout the Town, outside of new development/unassumed areas.

The Capital Engineering branch is responsible for the following projects:

2020 Construction

 
Type of Work 

 
Locations 
Road Resurfacing
  • King St.from Princess St. to Robert Hunter Cres.
  • Stegman Rd. (East of Red Mills Dr. to Hilltop Dr.)
  • Hilltop Dr. (East of Red Mills Dr. to East end)
  • Oxford Court (Farr Ave. to South end)
  • Plank Road  (1 Plank Road to 5 Plank Road)
  • (Project Notice)

Road Resurfacing with Ditch Regrading and Culvert 
Realignments 

Double High Float Surface Treatment 
  • Hillcrest Dr. from cul-de-sac to 150m east
  • Holborn Rd. from 2nd Concession Rd. to Leslie St.
  • 2nd Concession Rd. from Holborn Rd. to North end)
  • Doane Road from Centre St. to West end
  • Hornes Rd. from Woodbine Ave. to Warden Ave.
  • Jeffery Crescent 
  • (Project Notice)

Slurry Seal

  • Holborn Rd. from Woodbine Ave. to Hwy 404 cul-de-sac
  • Cedar St. from 120m East of Walnut Ave to East end
  • (Project Notice)
Sidewalk Construction 
  • Highway 48 from Princess St. to Foodland

Miscellaneous Concrete Repairs (Sidewalks & Curbs)

Crack Sealing

  • Various Locations throughout Town

 For more information on current and upcoming regional construction projects in East Gwillimbury, click herelinks to external site.

 

 